About
- JP
- EN
Profile

下坂浩和Hirokazu Shimosaka
- 一級建築士
- 1965
- 大阪生まれ
- 1988
- 神戸大学工学部建築学科卒業
- 1989-1990
- ワシントン大学(シアトル)大学院留学
- 1991
- 神戸大学大学院工学研究科建築学専攻修了(工学修士)
- 1991-2024
- 日建設計勤務
- 2024
- 下坂浩和建築設計設立
- 2025
- 京都工芸繊維大学ヘリテージアーキテクト養成講座修了
- 日本建築家協会 (2006-)
- 日本建築学会 (1988-)
- 京都府建築士会 (2014-)
Hirokazu Shimosaka
- 1st Class Architect (Japan)
- 1965
- Born in Osaka
- 1988
- Graduated Kobe University
- 1989-1990
- University of Washington, Seattle (Visiting Graduate Student)
- 1991
- Completed Graduate School at Kobe University (Master of Engineering)
- 1991-2024
- Worked at Nikken Sekkei
- 2024
- Established Hirokazu Shimosaka Architect
- 2025
- Completed Heritage Architect Program at Kyoto Institute of Technology
- The Japan Institute of Architects (2006-)
- Architectural Institute of Japan (1988-)
- Kyoto Society of Architects & Building Engineers (2014-)
Office
- 名称
- 下坂浩和建築設計
- 登録
-
一級建築士事務所
京都府知事登録(06A)第03718号 - 事業内容
-
- 住宅、店舗、公共施設など建築物全般の設計監理
- 歴史的建築物の活用計画、改修設計監理
- 新設および既存の美術館、博物館など文化施設の将来構想、計画
- 展覧会、展示会の会場構成、空間設計
- 建築文化に関する講演、執筆
- Name
- Hirokazu Shimosaka Architect
- Registration
-
1st class architect’s office;
Governor of Kyoto Prefecture Registration Number
(06A) No. 03718 - Business
Contents -
- Design and supervision of buildings in general, including houses, shops and public facilities
- Utilization planning, renovation design and supervision of historical heritage buildings
- Creating future visions and planning of new and existing cultural facilities, including museums
- Planning and space design of shows and exhibitions
- Lecturing and writing on architectural culture
Design Work Flow
-
ご相談Inquiry
Contactフォームからお問い合わせください。建築費や設計費、竣工までの期間等は、ご要望内容や時期によって変動しますので、ご相談いただいた後にご説明いたします。
-
ご提案Proposal
ご要望内容に沿って、計画案をご提案させていただきます。提案内容にご満足いただけた場合、計画案に沿って設計を進めさせていただきます。
-
設計監理契約Contract
設計業務に進む場合、建築士法で定められる通り、事前に業務内容を詳しくご説明させていただいた上で、設計契約を締結させていただきます。
-
設計Design
一般的な設計業務では、規模やご予算などの設計条件を踏まえて、さらに詳しくご要望をお聞きし、第一段階で建築関係法令に適った基本設計案や模型を作成します。ご了解いただいた後に、施工するために必要な詳細な仕様を定めて実施設計図を作成します。また、着工に必要な建築確認など、必要な法令手続きもおこないます。
-
工事費見積Cost Estimate
工事費は施工時期や、施工者によって若干、差が生じます。工事請負契約を締結していただく前に、施工者に見積を依頼し、工事に含まれる内容と金額をご確認頂けるよう、工事請負発注のお手伝いをいたします。
-
工事監理Construction Supervision
着工後、設計段階で定めた仕様や性能通りに工事が進められているか、主要な工事段階で確認いたします。また、事情により止むを得ず変更が必要な場合には、変更内容とその影響についてご説明させていただきます。
-
竣工・引渡しHand Over
工事完了時に工事請負内容と齟齬がないか確認し、建築を使用し始めるために必要な建築確認の竣工検査に立ち合い、検査済証を受領します。また、発注者さまのご確認にもお立ち会いさせていただきます。
-
アフターフォローAftercare
竣工・お引き渡しを経て、建物のご使用開始後も、不具合が生じた場合や、将来的に改修が必要になった場合には、ご遠慮なくご相談ください。
-
Inquiry
Please contact us using the Contact Form. Construction costs, design fees, required time for completion, etc. will vary depending on your requests and timing, we will explain these to you after the consultation of the project outline.
-
Proposal
We will propose a plan based on your requests. If you are satisfied with the proposal, we will proceed with the design according to the plan.
-
Contract
If we proceed with the design work, we will explain the scope of design work in advance, as stipulated by the Architect Act in Japan, and will then conclude with a design contract.
-
Design
In general design work, we listen to your requests in more detail, and based on design conditions such as building scale and budget, in the first stage create a basic design and a model that complies with building laws and regulations. After the approval, we create the detailed design drawings and specifications for construction. We also carry out the necessary legal procedures, such as building confirmation required for construction.
-
Cost Estimate
Construction costs vary slightly depending on the construction period and the contractor. Before the construction contract, we will confirm the contents and amount included in the work by requesting a cost estimate from the contractor.
-
Construction Supervision
After construction begins, we will check at key stages of construction to ensure that the construction is proceeding according to the specifications and performance determined at the design stage. In addition, if unavoidable changes are required due to circumstances, we will explain the changes and their impact.
-
Hand Over
Upon completion of the construction, we will check that there are no discrepancies with the contents of the construction contract, and will be present at the completion inspection for the building confirmation required to start using the building, and will receive the inspection certificate. We will also be present for the client's confirmation with the contractor.
-
Aftercare
Even after completion and delivery, and you have begun using the building, if any problems arise or if renovation becomes necessary in the future, please do not hesitate to contact us.